SW Kestor Drive Sidewalk Construction Project

FLPort St. LuciecityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
149014
Open Date
Feb 21, 2025
Close Date
--
Status
Closed

Description

The intent of the City is to procure the services of one (1) qualified Contractor related to construction services for SW Kestor Drive Sidewalk Construction Project. This work will be consistent with the adopted goals, objectives, and programs of the City of Port St. Lucie City Council. All work shall be in accordance with the project plans prepared by Culpepper & Terpening, Inc.   Construction Plans – Culpepper & Terpening, Inc., pages 1 – 57 The contract period is estimated at one hundred and eighty (180) calendar days with no option to renew. The project is to construct approximately 1.38 miles of 6-foot-wide concrete sidewalk on the north and east side of SW Kestor Drive from SW Darwin Boulevard to SW Becker Road. The project includes, but not limited to, concrete sidewalk, earthwork, clearing and grubbing, drainage modifications, swale relocation, utility relocations, record drawings, and all work and mate

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 7, 2026 | ID: 43890066

Open Construction Bids in Florida

FLCountyOpenTODAY
Ellis Building Gutter Replacement
Monroe County · #RFS-644
Construction
FLCountyOpenAug 14, 2026
Columns Repair and Structural Improvements at Northeast Transfer Station Truck Wash Building
Miami-Dade County · #RPQ No 18657-26
Construction
FLCountyOpenAug 14, 2026
Construction Manager At Risk (CMAR) Services for the South County Drinking Water Facility Project
Hillsborough County · #CMAR-26-00264
Construction
FLCityOpenAug 14, 2026
Professional Surface Repairs And Exterior Painting Of Islamorada Fire Station 20
Islamorada, Village of Islands · #RFP-RFP 26-09-0-2026/SMP
Construction