Building 3 Gymnasium Demolition. The contractor is responsible to remove all existing roof, structure, footings, walls, floor slabs, fixtures, electrical, plumbing, and mechanical systems. Abatement is not part of this bid. However, Demolition contractor is to work with the Abatement Contractor. Existing building piers are to be left. Do not demolish.All utilities safe-off will be done by Mt.Sac prior start of demolition*Reference A4E demolition drawings for the full scope of work*
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today