The City of Cheyenne (“City”) is currently seeking proposals for the following work as specified:The City of Cheyenne is currently in need of a steel structure to replace the existing ice slicer tent building for the City’s Street and Alley Facility. The existing 120’ x 80’(42’3” tall) ice slicer tent building was designed and built by Coverall nearly 20 years ago. It is currently in poor structural condition and has reached the end of its lifespan. The steel frame and fabric of the tent building will need to be removed, but the concrete foundation and stem walls will be preserved to be used for the new steel structure.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Wyoming. 175 open bids in Wyoming — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today