The Department’s Underground Utilities Division recently identified cracks in the top slab of the wet well and erosion around the sides of the building at Stormwater Pump Station SW- 2. The possible causes of the erosion are damages to the adjacent seawall, drainage pipes and structures.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today