The Storm Drainage System Replacement and Rehabilitation Project (SD-25000) has 2 project locations. The first is on Alester Avenue from Hamilton Avenue to Dana Avenue and the second is on Lambert Avenue and Birch Street. Based on the history of flooding in the area, this project proposes to upsize of the existing 12-inch line to 36-inch pipe for additional storage capacity. Pipe replacement in the streets may require additional work such as striping, sidewalk, curb and gutter, and curb ramp due to the location of the existing storm drain pipes. Due to the upsizing of the pipes, the connected catch basins will have to be removed and replaced.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today