PLUMBING NOTES & SPECIFICATIONS 1. GENERAL 1.1. THE PLUMBING PLAN SHALL COMPLY WITH INDICATED BUILDING, ENERGY CODE, AND ALL OTHER LOCALLY ADOPTED STANDARDS OR AMENDMENTS. 1.2. THESE DRAWINGS WILL NOT BE UPDATED FOR FIELD CHANGES NOT PREVIOUSLY DISCUSSED WITH ENGINEER AND LETTERS TO PASS INSPECTION AS A RESULT OF SUCH DEVIATIONS WILL NOT BE PROVIDED. THESE DRAWINGS REPRESENT THE ENGINEER'S INTERPRETATION OF THE APPLICABLE CODES, HAVE BEEN REVIEWED BY THE LOCAL AHJ FOR CODE CONFORMANCE, AND ARE CONSIDERED CONTRACT DOCUMENTS. 1.3. THESE DRAWINGS ARE INTENDED TO INDICATE CAPACITY, SIZE, LOCATION, DIRECTION AND GENERAL ARRANGEMENT, BUT NOT EXACT DETAILS OF CONSTRUCTION. THE FACT THAT ONLY CERTAIN FEATURES OF THE INSTALLATION ARE INDICATED MUST NOT BE TAKEN TO MEAN THAT OTHER SIMILAR OR DIFFERENT FEATURES WILL NOT BE REQUIRED. PLUMBING SYMBOL LEGEND PLUMBING FIXTURE SCHEDULE DWV PIPING SYSTEM MARK SAN SANITARY PIPING (E)SAN SANITARY PIPING , EXISTING V VENT PIPING GW GREASE / WASTE PIPING CD CONDENSATE PIPING 1.4. THIS CONTRACTOR SHALL COORDINATE WITH THE OTHER CONTRACTORS TO INSURE THAT EACH TRADE SHALL HAVE SUFFICIENT SPACE TO INSTALL THEIR EQUIPMENT (DUCTWORK, PIPING, ELECTRICAL WORK, ETC.). 1.5. WORK SHALL INCLUDE ALL LABOR, MATERIALS, PERMITS AND OTHER COSTS AS ARE NECESSARY FOR THE INSTALLATION OF A COMPLETE AND SATISFACTORY OPERATIONAL PLUMBING SYSTEM. CW COLD WATER PIPING 1.6. ALL EQUIPMENT FIXTURES, ETC. SHALL BE TESTED, ADJUSTED AND OPERATED AS INDICATED ON THE PLANS AND PLACED IN SATISFACTORY OPERATIONAL CONDITION BY THE PLUMBING CONTRACTOR. THIS CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP. MATERIALS AND EQUIPMENT TO BE FREE OF DEFECTS FOR A PERIOD OF ONE YEAR FROM DATE OF CERTIFICATE OF OCCUPANCY. THIS IS IN ADDITION TO ANY WARRANTY OR GUARANTEE FROM THE EQUIPMENT MANUFACTURER. FURNISH THE OWNER WITH THE MANUFACTURER'S WRITTEN CERTIFICATES. (E)CW COLD WATER PIPING HW HOT WATER PIPING HWR HOT WATER RE-CIRCULATION LINE 1.7. PLUMBING OR PIPING SYSTEMS INDICATED AS BEING UNDER "SEPARATE PERMIT" SHALL BE INTERPRETED AS A SEPARATE PERMIT PULLED BY THE PLUMBING CONTRACTOR WHICH INCLUDES DESIGN / PERMIT FEES, ENGINEERING FEES, UNLESS OTHERWISE DISCUSSED WITH THE GENERAL CONTRACTOR OR ENGINEER. 1.8. UNLESS NOTED OTHERWISE, ALL MATERIALS SHALL BE NEW, COMPLETE, INCLUDE MANUFACTURER'S WARRANTY AND SHALL BE U.L. APPROVED IF APPLICABLE. ALL WORK SHALL PRESENT A NEAT MECHANICAL APPEARANCE WHEN COMPLETED. 1.9.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,363 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today