SULLIVAN’S ISLAND STITH PARK – DRAINAGE IMPROVEMENTS PREPARED FOR: TOWN OF SULLIVAN’S ISLAND T&H PROJECT NO. J-32991 ADDENDUM NO. 2 April 7, 2026 TO: ALL HOLDERS OF RECORD OF CONTRACT DOCUMENTS Acknowledge receipt of this addendum by inserting its number and date in the Bid Form. Failure to do so may subject the bidder to disqualification. This addendum forms a part of the Contract Documents. It modifies them as follows. PART I – QUESTIONS & RESPONSES 1. Question – Is there a water source available for temporary irrigation of plants? Response – Yes, the Town can show the successful contractor available connections. PART 2 – TECHNICAL SPECIFATIONS 1. Attached is specification section 05603 for the slide gate in structure SMH#13. • The Slide Gate shall: o o o o Be stainless steel Hold water back from the marsh (north direction) side Have a non-rising stem Conform to the attached specification section 05603 Fabricated Stainless-Steel Slide and Weir Gates Other aspects of the project remain unchanged. THOMAS & HUTTON ________________________________ Mark F. Yodice, PE Attachment – Specification Section 05603 Fabricated Stainless-Steel Slide and Weir Gates End of ADDENDUM NO. 2 Sullivan’s Island – Stith Park Drainage Improvements Addendum #2 dated April 7, 2026 Z:\32991\32991.0000\Documents\Construction\Bid\Addenda\Addendum 002\Addendum 2 document - Stith Park Drainage Improvements 32991.0000.docxPage 1 of 1 05603–1 SECTION 05603 FABRICATED STAINLESS-STEEL SLIDE & WEIR GATES PART 1 – GENERAL 1.1 DESCRIPTION A. SCOPE: This section specifies heavy-duty, self–contained Stainless Steel upward opening slide gates for the SMH #13. B. TYPE: Slide gates shall be of fabricated stainless-steel heavy-duty construction, with gates, guides, and operators provided by one manufacturer. Gates shall meet the leakage requirements of AWWA C561. The equipment provided under this section shall be fabricated, assembled, erected, and placed in proper operating condition in full conformity with the drawings, specifications, engineering data, instructions, and recommendations of the equipment manufacturer unless exceptions are noted by the engineer. Gates and operators shall be supplied with all the necessary parts and accessories indicated on the drawings, specified, or otherwise required for a complete, properly operating installation and shall be the latest standard product of a manufacturer regularly engaged in the production of water control gates. C.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in South Carolina. 1,820 open bids in South Carolina — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today