The Ada County Highway District (ACHD) is requesting Statements of Qualifications (SoQ) from qualified consulting firms to provide design services for State Street, from Glenwood to 27th Street.This project includes roadway widening of State Street from Glenwood Street to 27th Street to seven (7) lanes, three (3) lanes in each direction with center medians and turn pockets where appropriate, HOV/Transit lanes, and buffered multi-use pathways on both sides of the roadway per the State Street.In Phase One (1) is the delivery of the 50% Design Plans for the entire corridor, establishing alignment and setting grade. Phase Two (2) will take one of the segments to 99% design in FY2027.
Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in Idaho. 488 open bids in Idaho — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today