The SR 135 Comprehensive Corridor Study, at the requests of City of Santa Maria and SBCAG Directors, will assess improvements along the corridor between the unincorporated community of Orcutt, the City of Santa Maria, and US-101 in Northern Santa Barbara County. Serving as a major arterial and main street, the corridor requires enhancements in safety, mobility, congestion, access management, and GHG emissions reduction, benefiting all road users, including disadvantaged communities. The study will serve as a coordinated planning effort to identify multimodal projects, such as roadway, transit, bicycle, pedestrian, and freight improvements, and to establish near- and long-term implementation priorities. In addition, bus rapid transit (BRT) service along the SR 135 corridor will be assessed. The BRT assessment should build upon existing work and include routing, scheduling, stop location, and implementation phasing concepts. SBCAG has a budget of $285,000 for the consultant component of this planning effort, funded through a Caltrans Sustainable Transportation Planning Grant and local contributions from the City of Santa Maria and SBCAG.
Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today