The existing chiller #2 has failed and is beyond its operational life. The project requires a turn-key installation of a new energy efficient 900 ton water-cooled chiller that is critical to the Central Energy plant to maintain current operating conditions. The STAR Center has an obligation to provide utility services (air conditioning system and chilled water) to the STAR Center tenants. This project will provide a more reliable air conditioning that is critical to the STAR center and tenant operations.
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today