The project consist of full replacement of three air handling units (AHU). One chilled water AHU (AHU-104) is located on the roof and Two chilled water AHUs (AHU-161 and AHU-162) are located indoors on a hanging structural platform. These two units will be replaced with one new unit. All new units will get new Direct Digital Controls.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today