BASE BID- Remove and replace two Jockey and three High Service (HS) Pumps to increase available servicepressure to Magnolia Point. Revised design points are summarized as follows:• Jockey Pumps: 400 gpm @ 196 ft (TDH) | 85 psig• HS Pumps: 1,200 gpm @ 196 ft (TDH) | 85 psig- Magnolia Point Loop Control Station 1 and Station 2 valving modifications to remove existing hydrauliccontrol valves with motor-operated butterfly valves.- Harbor Road Elevated Storage Tank (EST) hydraulic altitude valve removal and replacement withmotor operated butterfly valves.- Associated electrical and instrumentation improvements.- Bonaventure EST Improvements: Hydraulic altitude valve removal and replacement with motoroperated butterfly valves.ADDITIVE ALTERNATE 1- Harbor Road WTP and Magnolia Point Control Valve Improvements: Construct 200,000-gallon GroundStorage Tank 3 (GST 3) with conventional tray aerator to increase the storage capacity to 600,000gallons.ADDITIVE ALTERNATE 2- Construct two 10,000-gallon hydropneumatic tanks (Hydro Tanks) with air compressor.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,223 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today