Constructing approximately 10,500 LF of 16" fusible PVC (or alternate #1 HDPE), force main installed via directional drilling, Pump Station 2 collection system modifications, and limited activities to decommission the South Wastewater Treatment Facility.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,241 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today