The proposed project, hereinafter referred to as the “Project” consists of the construction of intersection improvements at SR 20 and CR 83A (W Bay Loop) west of Freeport, including turn lane extensions, multi-use path realignment, concrete traffic separator, resurfacing, drainage, signing, pavement markings, and traffic signalization, with the County supplying certain pre-procured signal components for contractor installation, subject to FDOT permit conditions.Contract Time: The contract duration is Contract Duration in Days days to substantial completion with an additional <path fill-rule="evenodd" clip-rule="evenodd" d="M6 12C5.44772 12 5 12.4477 5 13V15H3C2.44772 15 2 15.4477 2 16C2 1