Springfield Avenue (Coler to McCullough) Resurfacing, Section 22-00654-00-RS

ILUrbanacityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
141144
Open Date
Jan 15, 2025
Close Date
--
Status
Closed

Description

The project is located on Springfield Avenue from Coler Avenue to McCullough Street. The project consists of hot-mix asphalt milling and surfacing, concrete pavement reconstruction and pavement patching, structural slab construction at a box culvert, sidewalk replacement, storm sewer construction, street light replacement, and other work items.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Illinois. 2,211 open bids in Illinois — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 185132

Open Construction Bids in Illinois

ILStateOpenTODAY
Phase III Construction Engineering – Beecher Avenue Bridge Replacement
BidNet Direct - Illinois
Construction
ILStateOpenTODAY
Repair Concrete Base-wide, 126 ARW, Scott AFB
BidNet Direct - Illinois
Construction
ILcommunity_collegeOpenTODAY
209 E Main St | Mechanical HVAC Renovation (Re-Bid)
Carl Sandburg College · #BID07312026JS
Construction
ILStateOpenAug 17, 2026
UTHealth HCPC 3rd Floor Renovation - Painting
BidNet Direct - Illinois
Construction