The project is located on Springfield Avenue from Coler Avenue to McCullough Street. The project consists of hot-mix asphalt milling and surfacing, concrete pavement reconstruction and pavement patching, structural slab construction at a box culvert, sidewalk replacement, storm sewer construction, street light replacement, and other work items.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Illinois. 2,211 open bids in Illinois — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today