This is the re-bid of the second phase of a project is designed to redirect sewage flow within a 20" force main from Windsor St. to San Gully Rd.. Contractor will provide construction services and management to replace a short section of force main into the wet well at SW Pump Station (L0410). This will include replacing influent piping, related fittings, appurtenances, valves, and a pig port. A previously removed section of odor control piping will be reconnected from the wet well to the existing odor control equipment. Upon completion of the construction scope, the site will be restored and repairs will be made to a gate track.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today