This project consists of the safe and complete removal of the existing solar photovoltaic (PV) array system located at 808 East North Side Drive, Fort Worth, TX 76102.All work shall be performed in full compliance with applicable federal, state, and local codes, including OSHA and NEC requirements, as well as industry safety standards.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Texas. 3,624 open bids in Texas — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today