SO-1860 Hill EV Elec Infrastructure Addendum 1

MILansing School DistrictschoolOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

PRE-BID ADDENDUM NO. 1 TO SPECIFICATION 28172.00 OWNER: Lansing Public School District 519 West Kalamazoo Street Lansing, Michigan 48911 PROJECT: Electric Vehicle Charger and Battery Storage Integration with Hill Center Resiliency Project #SO-1860 CONTRACT FOR: Construction ENGINEER: CTC Engineering, LLC 3915 Research Park Dr., Ste. A-8 Ann Arbor, Michigan 48108 INTENT: The following is intended to be a clarification to the Contract Documents based upon the questions offered as a result of the Pre-Bid Walk Through on May 20, 2026. DRAWINGS: The submittals for the EV Chargers are attached herewith for reference only. The following drawings accompany this Addendum: • • • PROJECT MANUAL: Sheet 28172.00, E-2 Sheet 28172.00, E-2.1 Sheet 28172.00, E-5 -No sections are reissued with this Addendum- CLARIFICATIONS: A. Note that the bid proposals can be hand delivered, or mailed, and must be received no later than 2:00 pm, June 4, 2026 at: Lansing School District, Attn: Purchasing/Sealed Bid SO1860, 519 W. Kalamazoo St, Lansing, Michigan 48933. B. Attached is the bidders list of those Contractors that attended the pre-bid walk through held on May 20, 2026. C. The following questions and associated clarifications are made part of and binding to the Contract documents: 1. Are the EV chargers part of this Contract? Response: The acquisition of the EV chargers is not under this Contract, as they have already been purchased by the Owner. The installation of the chargers is under this Contract and shall be assigned to the Contractor at the site. 2. Will there be for construction drawing issued for bidding or are we to bid from the drawings labeled “preliminary – Not to be used for construction”? Response: You are to bid from the documents issued as part of this package. The “For Construction” documents will be issued at the time of award. 3. Will yellow Ideal plastic bollard protection sleeves be allowed in lieu of painting the bollards? Response: Yes. 4. Where are TR-1 and Panel GA-1 located? Response: Sheet E-2 shows the overall equipment locations. Please see Sheet 28172.00 E-2.1 for more specific locations. 5. Please provide specs or a submittal of the owner provided bus EV chargers. Response: Please see the attached submittals for the EV Chargers. 6. Who is responsible for final installation and startup of the Bus EV chargers? Response: The final installation is under this Contract but the startup will be performed by others. 7.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Michigan. 1,172 open bids in Michigan — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 29, 2026 | ID: 15804255

Open Other Bids in Michigan

MIcommunity_collegeOpenTODAY
Delta College - Student Resource Center/Library (A Wing)
Delta College · #2025021 CMC
Other
MIStateOpenTODAY
Delta College - Student Resource Center/Library (A Wing)
BidNet Direct - Michigan (MITN)
Other
MICityOpenTODAY
City of Eastpointe 9 Mile Road Rain Garden Project
Eastpointe · #0145-0818 A
Other
MICityOpenTODAY
RFQ for Site Plan Reviews
Sturgis · #Site Plan
Other