Addendum #1 Project Name: Addendum 1: LSD: North Elementary Site Work Project 05.04.2026 1. Notes/Additions in Scope from Site Walk-through: - Added Concrete Scope of work per attached. - No other changes Bid Due Date: May 8th @ 10 am (Hand Delivered) Addendum 1_North Elementary_050426.docx WC 02: New ScopeGrade, Top-soil & Seed WC 02/10: New Concrete. Grade, Top-soil & Seed WC 02/04: New Basketball Court (7,500 sf) (98'x78') and 4-Square Courts (12'x12'). Asphalt to be (2) 2" lifts... Total of 4" with 6" of 21A as base. Add 1: Remove & Replace sidewalk that is highlighted. WC 02:Move "Gagaball" rink and place on basketball court when complete. WC 02: Demo Asphalt and grade/seed. WC 02/04: Remove & Replace Asphalt. (2) 2" lifts... Total of 4". Existing base to remain. WC 02/10: Remove Asphalt; Install new sidewalk down the middle. Grade/Top-soil & seed. WC 10: Install New Sidewalk (6' wide) w/ 6" of 21A as base. WC 02: Repair grade from damage of doing this work. WC 04: New Seal Coating of walking trail. WC 10 Allowance = $25K to repair concrete as needed from damage of doing this work. ALL: Access site from this location. WC 10: Raise & Repair at 2 catch basins. Pour around them 8'x8'. South Parking Lot.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Michigan. 1,173 open bids in Michigan — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today