650 - 44th Street SE Grand Rapids, MI 49548 ph: 616.532.8191 www.beckering.com Beckering Construction Notes for Don Johnson Fieldhouse Addendum #1 1. Addendum #1 does not involve any revisions to the bid scopes. 2. Post Bid Interviews will be conducted on Friday, June 5, 2026. They will be virtual and times will be announced. LSD Don Johnson Addendum No. 1 Narrative of Changes Project Name: Project Location: Owner/Client: Issued to: City/State: Don Johnson Field House – Pool Renovations SO-1855 400 N Pennsylvania Ave, Lansing, MI 48912 Lansing School District Date: June 1, 2026 Architect’s Project #: 26000063A Attention: David Beckering Beckering Construction Grand Rapids, MI Email: djb@beckering.com 49548 Zip: Delivered via: ☐ Messenger ☐ Hand-carried Address Sent to: ☐ Express ☐ Pick-up ☐ Newforma ☐ Mail ☐ FTP ☒ Email ☐ UPS This Addendum revises the Contract Documents and shall have the same force and effect; make the following changes to the Specifications and Drawings for this project. The following is a written summary of the changes made by this Addendum. Strict attention should be given to the Drawings and Specifications for area take-off, quantities and items deleted or revised herein. This addendum forms a part of the Contract Documents. Issued by CED by: Prepared by: Distribution: Courtney Norris Courtney Norris Refer to Newforma transmittal. Date Signed: Date Signed: 06/01/2026 06/01/2026 Below is a list of the changes made to our documents in response to the comments, RFIs, or clarifications provided prior to Bid. Please feel free to reach out with any further questions or clarifications in a timely manner. Sincerely, Courtney Norris LSD Don Johnson Addendum No. 1 – Narrative of Changes Page 1 | 4 General Notes/ Clarifications • Prevailing Wages are required on this project. RFI Questions • Regarding the existing fire alarm system, please provide the manufacture and main panel (FACP) information. o Answer: Please see attached photos of existing fire alarm system panels. • Will the existing intrusion system need to be extended to new doors 101A and 101B? If so, please provide intrusion system information. o Answer: The intrusion system will not be extended to doors 101A and A101B. Doors should be prepped to receive door contacts. • With the exiting pool tank being infilled, should demolition of any pool equipment (pumps, controllers, etc.) be included? If so, please provide additional scope information.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Michigan. 1,173 open bids in Michigan — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today