Project Description: The redevelopment at Smith Cove Park East Parcel includes new athletic grass, a fenced off-leash dog area, a bioretention pond, and a series of paths and trails. Two bid additives are included in this project. Bid Additive #1 covers the purchase and installation of additional benches. Bid Additive #2 includes the material, fabrication, and installation of an SPR kiosk.Engineer's Estimate: Base Estimate: $4,178,232.63, Additive#1: $31,317.43, Additive#2: $8,512.87Project Location: Smith Cove Park- 1451 23rd Ave W, Seattle, WA 98199
Unlock the source link for this bid, plus email alerts when similar Other bids open in Washington. 1,327 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today