The project consists of a total of 3.27 miles of road improvements including 2.63 miles of Silverbell Rd., from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Rd., 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Dr. The construction consists of four lanes of roadway with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping and irrigation, utility work and drainage facilities.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 930 open bids in Arizona — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today