Construction of the water mains will include approximately 62 linear feet (lf) of 12” diameter water main, 1,050 lf feet of 8-inch-diameter water main and approximately 670 lf of 4-inch-diameter future reservoir fill line. Installation, connection, mechanical improvements, electrical and controls for County provided booster pump station. There will be domestic service connections and fire hydrants. The 4” mains will be installed from the existing reservoir, located just to the north of the high school, along a proposed easement just east of the existing property line and then within the existing roadway and utilities easement and terminate at Halo Rim Drive. The 8” water mains will be installed along existing development roadway and utilities easements.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,357 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today