Shadow Mountain Water System Project (Water Main and Booster Pump Station)

WACowlitz CountycountyConstructionCloses in 19 days
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
Sep 28, 2026
Status
Open

Description

Construction of the water mains will include approximately 62 linear feet (lf) of 12” diameter water main, 1,050 lf feet of 8-inch-diameter water main and approximately 670 lf of 4-inch-diameter future reservoir fill line. Installation, connection, mechanical improvements, electrical and controls for County provided booster pump station.  There will be domestic service connections and fire hydrants.  The 4” mains will be installed from the existing reservoir, located just to the north of the high school, along a proposed easement just east of the existing property line and then within the existing roadway and utilities easement and terminate at Halo Rim Drive. The 8” water mains will be installed along existing development roadway and utilities easements.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,357 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Sep 8, 2026 | ID: 87796718

Open Construction Bids in Washington

WAUnivOpenTODAY
208786 Fleet Carwash Oil Water Separator
University of Washington
Construction
WACountyOpenSep 10, 2026
Permitting Abatement and Hazardous Materials Services Work Order
King County · #KC001700
Construction
WAtribalOpenSep 15, 2026
RFP Quinault Tribal Courthouse Construction
Quinault Indian Nation
Construction