Security Screening Checkpoint Expansion

CAOntario International AirportairportUtilities
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
118547
Open Date
Sep 25, 2024
Close Date
--
Status
Closed

Description

The Project will:•Add two screening lanes in Terminal 2 and an additional screening lane in Terminal 4 checkpoints by relocating the exit corridor.•Relocate the TSA Manager’s Station and Screening Room closer to the windows at both Terminal 2 and Terminal 4 to allow almost 20-feet of clear space in the circulation corridor.•Add another screening lane at the Terminal 2 checkpoint by replacing the Manager’s Station and modifying existing screening equipment.•Replace document check podiums with CAT scanners for a total of 11 units at each checkpoint.•Add to and/or adjust existing CCTV, electrical systems, communications, and lighting to accommodate new and modified screening lanes at both checkpoints.•Renovate adjacent TSA breakrooms in both terminals.•Include new CCTV and Backflow Alarm System at the exit corridor in both terminals.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Utilities bids open in California. 4,840 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 9, 2026 | ID: 44654842

Open Utilities Bids in California

CAStateOpenAug 18, 2026
Uninterrupted Power Supply Services
BidNet Direct - California
Utilities
CACityOpenAug 18, 2026
146497 Substation Operations Ergonomic Chairs
Los Angeles · #231153
Utilities
CACountyOpenAug 21, 2026
Bear Valley Sheriff's Substation Architectural RFP
Alpine County
Utilities
CACityOpenAug 27, 2026
Hunter Substation Circuit 21 and 22 4KV-12KV - Make-Ready
Riverside
Utilities