Schunior Detention Pond Phase 3

TXEdinburgcityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
69045
Open Date
Nov 16, 2023
Close Date
--
Status
Closed

Description

The project consists on building a drainage structure around City's raw water line downstream of the Schunior Detention Pond, recently constructed. The project includes excavation, grading, drainage structures and dewatering per Engineering Plans and Specifications prepared by SAMES, Inc.  

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Texas. 3,624 open bids in Texas — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 30, 2026 | ID: 2875222

Open Construction Bids in Texas

TXstate_agencyOpenTODAY
Clements Unit - Construction Manager at Risk for BOQ
Texas Department of Criminal Justice · #RFSQ-US.227527
Construction