The following scope of work is required to complete the San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation Project:Provide all materials, equipment, and labor necessary to:Install approximately 420 LF of 24’ CIPP Liner in the 24” ACP trunk sewer on San Pablo Dam Road from MHM17105 to MHM17106 Provide Traffic controlTemporary Bypass/pumpingCCTV post-installation inspection videoAcquire Required Permits (see technical specifications section)Complete construction installation work during night time when traffic and sewage flows are below average as determined by WCW Complete project within 30 Calendar days of NTP