The project site is located on Saddletree Court (J-0260) inside Devenger Place subdivision and Ladykirk Lane (J-0976) inside Carisbrooke subdivision in Greenville, South Carolina. The project site occupies land on private properties. The main purpose of the project is to improve the drainage system. Work consists of the demolition/removal of trees and fences and the installation of new storm drainage lines and catch basins. Site stabilization shall include placing inlet protection at new catch basins, fine grading, and grassing of all disturbed areas.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in South Carolina. 1,748 open bids in South Carolina — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today