The project consists of the following items:1. New replacement Ultra High Frequency (UHF) and Very High Frequency (VHF) radios (transmitters and receivers for air traffic communications). These would be the primary and back up radios, and installed on equipment racks on the seventh floor of the tower;2. New replacement radio antennas and lighting protections installed at the roof level to support new radios;3. New carpet with static electricity dissipation function at the interior top floor of the tower control cab level;4. Replacement interior ceiling and associated lighting of the tower control cab level;5. Replacement aluminum windows on the four exterior vertical walls below the tower control cab level.All work will be performed inside the existing tower facility.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today