There is an existing 75 LF, 96" CMP culvert under Rosebay Drive located adjacent to 1 Rosebay Drive in the Dove Tree Subdivision off Roper Mountain Road in Greenville. The culvert is nearing the end of it's serviceable life. Due to it's location and conflicts with driveway access and utility lines, we would like to rehab it in place instead of replacing it.The preferred method of rehab is placing a lining of Geo-Krete/Geopolymer material (or comparable) inside of the pipe using the centrifugally cast method. A live stream flows through the culvert, so maintaining creek flow will be imperitive during the project.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in South Carolina. 1,748 open bids in South Carolina — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today