Riverside Drive Slope Protection

TXTarrant Regional Water Districtwater sewerConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
255659
Open Date
Apr 13, 2026
Close Date
--
Status
Closed

Description

The Tarrant Regional Water District (Owner) is requesting Proposals for the construction of the following Project:26-095 Riverside Drive Slope ProtectionThe Owner's Budget for the Project is $600,000. The Project is to be Substantially Complete and ready for operation on or before September 30, 2026.Work is described in general, non-inclusive terms as:Concrete slope protection adjacent to the Fort Worth Trinity Trail under the Riverside Drive bridge along the West Fork Trinity River.Concrete key walls along the perimeter of concrete slope protection with rock riprap toe protection placed at the bottom of the bank.Vegetated rock riprap bank protection upstream and downstream of concrete slope protection. Handrail foundation along the top of bank and widening of the existing trail under the bridge.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Texas. 3,624 open bids in Texas — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42360665

Open Construction Bids in Texas

TXstate_agencyOpenTODAY
Clements Unit - Construction Manager at Risk for BOQ
Texas Department of Criminal Justice · #RFSQ-US.227527
Construction