RFQ/RFP - Addendum 1

ALAlabama Port AuthorityportOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
--

Description

Ship Unloader Crane Removal Project Name Project No. To: Specification Booklet Ship Unloader Crane Removal 11781 Task No. 01 Addendum No. 1 Prospective Bidders Date: 5/11/2026 The following are additional documents and answers to questions received. Item Description 1. The pre-bid sign in sheet is attached. 2. A picture of the delivery of the S Crane to Dock 1 for informational purposes only. 3. Additional reference drawings associated with the S Crane are for informational purposes only. While the Alabama Port Authority believes this information to be substantially accurate, no responsibility is assumed by the Alabama Port Authority for its completeness or accuracy. 4. Pre-Demolition Hazardous Materials Survey. Attachments Clarifications 5. The contractor will be given access to the berth at Dock 1 for a maximum of 30 days. Questions 6. 7. 8. Given the specialized nature of this project with movement of the S Crane from Dock 1 to Dock 3 and yard 4, followed with the demolition of the S Crane, can the Contractors License requirement for the state of Alabama be: 1) Waived or postponed until after the bid date but before work takes place? 2) Can a contractor’s license from another state be acceptable? Answer: No. Having an Alabama General Contractors license is a requirement to submit a bid proposal for this project. Confirm that the conveyor gantries below the S-Crane and Dock 1 will be removed and later installed by the Alabama Port Authority. Answer: Confirmed. The tender documents reference the contractor removing the conveyor gantry sections on Dock 3. However, could you confirm whether these sections are to be reinstated following the completion of the work, or if they are to be scrapped? Answer: These are to be scrapped. Ship Unloader Crane Removal 9. 10. 11. Specification Booklet If the conveyor gantry sections are to be scrapped, would there be a favorable view taken if the contractor proposed scrapping the full length of the conveyor, rather than only the sections required for demolition? Answer: No, the contractor should only remove sections of the conveyor as required for crane demolition. Do you have any Center of Gravity data available of the S-Crane? Answer: Attached are additional reference drawings for informational purposes only. Additional drawings may be published in future Addenda.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Alabama. 456 open bids in Alabama — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 12, 2026 | ID: 5820668

Open Other Bids in Alabama

ALCityOpenSep 16, 2026
Perennial Ryegrass 3-Way Blend Seed for Sports Fields
Foley · #ITB-FST-091626-0-2026/LE
Other
ALCityOpenSep 21, 2026
Lake Wilmore Maintenance Barn
Auburn
Other