Allen County Sanitary Engineering Department Request for Qualifications (RFQ) Construction Manager at Risk (CMAR) Services BOSC Pump Station & Forcemain February 26, 2026 A. Project Information 1. Project Name: Sanitary Engineering Department BOSC Pump Station & Forcemain 2. Owner: Allen County Sanitary Engineer 3. Address: NE quadrant of Bluelick Road and Cole Street 4. Engineer: ms Consultants 5. Estimated Construction Cost: $29,834,256.00 6. Scope: This project includes construction of the new BOSC Pump Station and Forcemain on the northeast quadrant of the Bluelick Road and Cole Street intersection in Allen County, Ohio. The pump station is to be a suction lift pump station with a firm capacity of 2.5 million gallons per day (MGD) at full build out. The project will also include design of dual forcemains. The first forcemain will begin as a 10-inch forcemain at the BOSC pump station (PS) and continue to the American Bath Plant where a portion of flow will split off, the forcemain will then continue as an 8-inch to the American II plant with its remaining flow. The second forcemain will be a 16-inch forcemain to convey flows from the Bosc PS to the existing 78” gravity sewer at the intersection of Woodward Avenue and Grand Avenue within the City of Lima, Ohio. The two forcemains will be approximately 20,100 linear feet (LF) and 17,900 LF of forcemain, respectively. 7. Schedule: RFQ Phase RFQ Advertised 02/27/26 SOQs Due 03/13/26 Short-listed Firms Notified 03/18/26 RFP Phase RFP Issued 03/20/26 Proposals Due 04/15/26 Interviews Week of 04/20/26 CMAR Selection Announced 04/27/26 Construction Phase Estimated Construction Start Date Q4 2026 Substantial Completion Date 01/2028 Final Completion Date 06/2028 8. Delivery Method BOSC PS & Forcemain Request for Qualifications 1 of 9 a. Allen County Sanitary Engineer (Owner) intends to contract for Construction Manager at Risk (CMAR) services as defined in Section 9.33 of the Ohio Revised Code (ORC) for the BOSC Pump Station and Forcemain Project. 9. Procurement Process a. The Owner requests statements of qualifications (SOQ) from experienced CMAR firms to provide CMAR services associated with the Project. Using the evaluation criteria included in this RFQ, the Owner will review the responsive SOQs from CMAR firms (Respondents) to develop a list of Respondents qualified to receive the future request for proposal (RFP).
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Ohio. 1,213 open bids in Ohio — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today