Date June 6, 2023 ADDENDUM NO. 1 To Project Bidding Documents for: TV-23 Bio-Tech Classroom Compton Community College tBP Project. No. 21105.00 tBP/ARCHITECTURE 4611 Teller Avenue Newport Beach, CA 92660 949/673-0300 TO: PROSPECTIVE BIDDERS This Addendum forms a part of the Contract Documents and modifies the original approved Bidding Drawings. Acknowledge receipt of this Addendum in space provided on the Bid Form. Failure to acknowledge may subject Bidder to disqualification. CHANGES TO THE SPECIFICATIONS. 1. 2. 3. 4. 5. 6. 7. 8. GENERAL REQUIREMENT TABLE OF CONTENT BID PROPOSAL FORM EXHIBIT A - SITE LOGISTICS PLAN SECTION 000110 TABLE OF CONTENTS SCOPE OF WORK SECTION 010100 SECTION 012100 ALLOWANCE SECTION 271000 STRUCTURAL CABLING. SECTION 283100 Deleted Specification Section in its entirety. CHANGES TO DRAWINGS 1. SHEET T-2 SHEET INDEX AND GENERAL INFORMAITON Drawing List Architectural sheets replace D-3 by A-3 2. SHEET AS-1–- ENLARGED SITE PLAN Added detail for parking sign, added notes clarifying scope at ADA parking Relocation of drinking fountain is shown. See attached revised sheet. 3. SHEET A1-1 FLOOR/CEILING & INTERIOR ELEVATIONS Corrected Construction Notes Added clear wire mold location, clarifying notes, 75% demo of the wall paneling drywall. IDF location. See attached revised sheet. 4. SHEET A-3 DETAILS. Removed one detail added and updated Drinking fountain relocation and details. See attached revised sheet. 5. SHEET P1-1 PLUMBING FLOOR AND SITE PLAN Relocation of drinking fountain was TV-23 Bio-Tech COMPTON COMMUNITY COLLEGE DISTRICT ADDENDUM NO. 1 Page 1 of 2 LS. Removed one detail add added. See attached revised sheet. LS. Removed one detail add SHEET E0-1 See attached revised sheet. 6. a. Revised floor box outlet symbol per attached revised Drawing E0-1. b. Revised panel schedule “NP16” per attached revised Drawing E0-1 LS. Removed one detail add 7. SHEET E1-1 See attached revised sheet. a. Revised location of IDF cabinet per attached revised Drawing E1-1. LS. Removed one detail add 8. SHEET E2-1 See attached revised sheet. a. Revised location of IDF cabinet per attached revised Drawing E2-1. b. Extended raceways per attached revised Drawing E2-1. c. Deleted three (3) receptacles on north wall of the room per attached revised Drawing E2-1. 9. ENGINEER CONSTRUCTION ESTIMATE $180,000.00 ---End of Addendum--ATTACHMENTS 1. Full Size Documents 30” x 42” Drawings: (Total 7) AS-1 A1-1 A-3 P1-1 E0-1 E1-1 E2-1 2.
Unlock the source link for this bid, plus email alerts when similar Other bids open in California. 4,931 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today