ADDENDUM NO. 2 RFP Title: Otero County Road & Bridge Facilies Post Fire Redevelopment Project: Otero County Road & Bridge Shop, Office, and Storage Facilies Locaon: 103 6th Street, Fowler, CO 81039 RFP No.: V2.0 Date: January 22, 2026 This Addendum modifies and becomes part of the above-referenced Request for Proposals (RFP). Except as specifically modified herein, all other terms and condions remain unchanged. A. QUESTIONS & ANSWERS Reference: General/Administrave Q1. We would like to provide a quote for the interior poron of this project. I checked the drawings posted online, but I did not see anything detailing the offices and restroom. Do you have any more informaon on them? A1. Dedicated interior office and restroom drawings are not included in the RFP. For all available dimensional, structural, and layout informaon related to the office and restroom areas, Contractor shall reference: • RFP Page 5 – Secon: Technical Specificaons, Table 1: Shop & Office Facility Specificaons, and • A©achment D – Fowler Shop Reference Drawings (Sheets D1, E1, P1, S2 – Reference Only), issued with Addendum No. 2 Note: A©achment D is provided for reference only and is issued separately as “A©achment D – Fowler Shop Reference Drawings”. It is provided with this Addendum as a separate a©achment and will also be posted on the County website. Bidders may rely on this informaon solely as a general guide. Contractor is responsible for verifying all exisng condions and ensuring their Otero County RFP – Road & Bridge Facilities Post Fire Redevelopment Addendum No. 2 – January 22, 2026 Page 1 of 17 proposed design and construcon meet all RFP requirements and applicable building code. Q2. Will bonding be required on this project? I do not see it outlined on any of the RFP documents, but I may have missed it. A2. Bonding is not required for this project. Contractors must comply with all insurance requirements listed on: • RFP Page 15 – Secon: Insurance Acknowledgment (Exhibit C). Shop and Office Facility Q3. Was the exisng slab damaged in any way during the fire or the removal of the building? A3. No. The slab was not damaged. Q4. Are drawings available for the previous structure that burned? A4. A limited set of reference drawings is available and will be posted with Addendum No. 2 as A©achment D – Fowler Shop Reference Drawings (Sheets D1, E1, P1, S2 – Reference Only). Q5.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Colorado. 1,039 open bids in Colorado — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today