RFP Version 2.0 - Addendum No. 2

COOtero CountycountyOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

ADDENDUM NO. 2 RFP Title: Otero County Road & Bridge FaciliŸes Post Fire Redevelopment Project: Otero County Road & Bridge Shop, Office, and Storage FaciliŸes LocaŸon: 103 6th Street, Fowler, CO 81039 RFP No.: V2.0 Date: January 22, 2026 This Addendum modifies and becomes part of the above-referenced Request for Proposals (RFP). Except as specifically modified herein, all other terms and condiŸons remain unchanged. A. QUESTIONS & ANSWERS Reference: General/AdministraŸve Q1. We would like to provide a quote for the interior porŸon of this project. I checked the drawings posted online, but I did not see anything detailing the offices and restroom. Do you have any more informaŸon on them? A1. Dedicated interior office and restroom drawings are not included in the RFP. For all available dimensional, structural, and layout informaŸon related to the office and restroom areas, Contractor shall reference: • RFP Page 5 – SecŸon: Technical SpecificaŸons, Table 1: Shop & Office Facility SpecificaŸons, and • A©achment D – Fowler Shop Reference Drawings (Sheets D1, E1, P1, S2 – Reference Only), issued with Addendum No. 2 Note: A©achment D is provided for reference only and is issued separately as “A©achment D – Fowler Shop Reference Drawings”. It is provided with this Addendum as a separate a©achment and will also be posted on the County website. Bidders may rely on this informaŸon solely as a general guide. Contractor is responsible for verifying all exisŸng condiŸons and ensuring their Otero County RFP – Road & Bridge Facilities Post Fire Redevelopment Addendum No. 2 – January 22, 2026 Page 1 of 17 proposed design and construcŸon meet all RFP requirements and applicable building code. Q2. Will bonding be required on this project? I do not see it outlined on any of the RFP documents, but I may have missed it. A2. Bonding is not required for this project. Contractors must comply with all insurance requirements listed on: • RFP Page 15 – SecŸon: Insurance Acknowledgment (Exhibit C). Shop and Office Facility Q3. Was the exisŸng slab damaged in any way during the fire or the removal of the building? A3. No. The slab was not damaged. Q4. Are drawings available for the previous structure that burned? A4. A limited set of reference drawings is available and will be posted with Addendum No. 2 as A©achment D – Fowler Shop Reference Drawings (Sheets D1, E1, P1, S2 – Reference Only). Q5.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Colorado. 1,039 open bids in Colorado — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 352319

Open Other Bids in Colorado

COwater_sewerOpenTODAY
Housing Needs Assessment, Housing Action Plan, and Comp Plan Elements
Cherry Creek Valley Water and Sanitation District
Other
COwater_sewerOpenTODAY
Federal Affairs and Strategic Funding
Cherry Creek Valley Water and Sanitation District
Other