Compton Community College District 1111 E. Artesia Blvd. Compton, CA 90221 DATE: April 30, 2024 TO: All Bidders PROJECT: RFP CCC-081 STUDENT HOUSING SUBJECT: ADDENDUM #2 A# 03-123205 INC 01 and INC 02 The following changes, omissions, and/or additions to the Project Documents shall apply to bids made for and to the execution of the various parts of the work affected thereby, and all other conditions shall remain the same. Careful note of the Addendum shall be taken by all parties of interest so that the proper allowances may be made in strict accordance with the Addendum. Respondent shall acknowledge receipt of this Addendum in the bid documents. Failure to do so may subject Respondent to disqualification. 1. Changes to Contract Documents: 1.1. Replace the “Commissioning” document with the attached Exhibit C “Commissioning”. All changes are in red. 2. Changes to Scope: 2.1. Clarification to drawing T1.01-01. Note 6 references a 12-strand SM fiber and a 25-pair cable from A106A to the Campus Data Center in the MIS Building. The approximate distance from the two locations is 1200 LF. Compton Community College District RFP CCC-081 Student Housing ADDENDUM #2 PAGE 1 Attachments: Exhibit A- Updated Section 01 81 00-4 “Commissioning” G1.32- Updated to Clarify Modules G1.33- Updated to Clarify Modules G3.10- Updated to Clarify Signage E0.02- Updated to clarifying lighting controls E3.11- Updated to clarifying lighting fixture E3.13- Updated to clarifying lighting fixture E3.21- Updated to clarifying lighting fixture E3.23- Updated to clarifying lighting fixture E3.31- Updated to clarifying lighting fixture E3.33- Updated to clarifying lighting fixture END OF ADDENDUM #2 Compton Community College District RFP CCC-081 Student Housing ADDENDUM #2 PAGE 2 Exhibit A COMPTON COMMUNITY COLLEGE DISTRICT 2. Complete Commissioning Report Forms. Reports are to be completed in a neat easily readable condition. 3. Complete the respective start-up and check out procedures and insure readiness of equipment and systems prior to the start of the functional performance testing. Written confirmation of system readiness for performance testing is required. 4. Provide qualified representatives performance commissioning process. for the functional 5. B. Assure that all subcontractors, suppliers, test and balance, controls, etc. include in there respective contracts cost necessary to participate in and complete the commissioning process.
Unlock the source link for this bid, plus email alerts when similar Other bids open in California. 4,950 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today