BURNS HALL HVAC REPLACEMENT NORTHWEST ARKANSAS COMMUNITY COLLEGE 1 COLLEGE DRIVE BENTONVILLE AR 72712 SYMBOLS LEGEND PROJECT DRAWINGS ARE LAYED OUT USING THE CSI "CONDOC" SYSTEM. LETTERS A - H F 101 DOOR TYPE DOOR MARK (NUMBER) Name Elevation SAMPLE GRID 2 NUMBERS 1 - 6 1 A11.03 1 A11.02 BUILDING SECTION (See Plans and Building Elevations) DIRECTION OF VIEW SECTION LOCATOR/NUMBER SHEET NUMBER SIM WALL SECTION (See Plans and Building Elevations) DIRECTION OF VIEW SECTION LOCATOR/NUMBER SHEET NUMBER SLOPE TYPICAL DRAWING SHEET: ROOF SLOPE (See Roof Plans) DIRECTION OF UPWARD SLOPE RATIO OF SLOPE 1:12 THE DRAWING/DETAIL SHEET IS BORDERED BY NUMBERS AND LETTERS CREATING A GRID. THIS GRID IS USED TO LOCATE AREAS OF THE DRAWING FOR REFERENCE AND PINPOINT DETAILS. EXAMPLE: NOTE THE DETAIL SYMBOL ON THE SHEET. ITS LOCATION IS "2F". IN DISCUSSION YOU WOULD SAY "LOOK AT THE DETAIL LOCATED AT "2F" ON SHEET A16.01. THIS NUMBER MAY BE KEYED INTO THE DETAIL SYMBOL AND WOULD READ "2F - A16.01." Room name 0 GRID LINES EXISTING COLUMN (Letters typ. run Vertical, Numbers typ. run Horizontal) A 1A 1 A11.02 SIM BUILDING ELEVATION (See Plans and Building Elevations) DIRECTION OF VIEW ELEVATION LOCATION/NUMBER SHEET NUMBER 1A/A1.01 4A/A1.01 INTERIOR ELEVATION (See Plans) DIRECTION OF VIEW ELEVATION LOCATION/NUMBER SHEET NUMBER 3A/A1.01 WINDOW TYPE WINDOW MARK (LETTER) AL-1 1 P1 KEY NOTE (See Building Elevations, Building Sections, Wall Sections, Detail Views, and the Material Legend) MATERIAL CALLOUT REVISION REFERENCE NUMBER OF REVISION CORRESPONDING TO SECTION IN TITLE BLOCK PARTITION TYPE PARTITION MARK (NUMBER) *********************************************** GENERAL CONTRACT REQUIREMENTS AFFECTING ALL TRADES IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND EACH OF THE SUBCONTRACTORS TO REVIEW ALL DRAWINGS TO ENSURE COORDINATION OF ALL WORK AFFECTING EACH TRADE. ********************************************** 1. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EXISTING SITE CONDITIONS PRIOR TO CONSTRUCTION TO COORDINATE THE SITING OF NEW UTILITIES AND NEW BUILDING INSTALLATION WITH EXISTING UTILITIES, EXISTING BUILDING LOCATIONS AND SITE ITEMS TO REMAIN. 2. CONTRACTOR TO COORDINATE STORAGE AND STAGING AREAS WITH OWNER'S REPRESENTATIVE TO AVOID INTERFERENCE WITH OWNER'S USE OF EXISTING BUILDINGS, PARKING AREAS, AND GROUNDS. 3.
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in Arkansas. 538 open bids in Arkansas — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today