RFP 2023 005 PRS Modular Classrooms Addendum No pdf

CTSouth Windsor School DistrictschoolOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
2023
Open Date
--
Close Date
--
Status
Open

Description

ADDENDUM NO. 01 PRS MODULAR CLASSROOMS 949 AVERY STREET SOUTH WINDSOR, CONNECTICUT FOR THE TOWN OF SOUTH WINDSOR Client Project No. 2023-005 R&D File No. 22126 December 19, 2022 The following list of changes are hereby made to the bid documents dated December,09, 2022 for the project referred to above. Bidders shall indicate receipt of this addendum on the bid form and reflect the changes in bids submitted. Additional compensation or change orders will not be granted after the contract is awarded or during construction due to omission of the listed items by the bidder. 1. ADDENDUM NO. 01 • • Updated drawings with vocabulary changes and updated Bidding manual with cover page and table of contents in the correct order. Answer to initial RFI’s RESPONSE TO RFI #1 1) QUESTION: What date will we be allowed on site to begin site work for the modular units? ANSWER: Construction may begin on the day after the last day of school projected June 16th, 2023. Exact date is subject to change due to snow days etc. Please refer to the link to the school district’s calendar in the attachments section of addendum No. 01 to see the latest schedule. 2) QUESTION: What is the completion date for this project? ANSWER: Construction must be substantially completed and the modulars ready for use by August 15th, 2023. Please refer to the link to the school district’s calendar in the attachments section of addendum No. 01 to see the latest schedule. 3) QUESTION: Can the LD’s (Liquidated Damages) be waived? ANSWER: No. Liquidated damages of $1,000 per day beyond the substantial completion date of August 15, 2023 is applicable. 4) QUESTION: Is a Bid Bond Required? ANSWER: Yes, it is 5% of the base bid. R:\A-YR-2022\22126 South Windsor Public Schools\RDI Bidding\PRS Modular Classrooms Addendum No. 01 (12.19.2022) Updated.Docx 5) QUESTION: Are the modular unit’s sale or lease? If lease what are the terms? ANSWER: The school district will be leasing the modular units. The district intent is to lease the units for a nineyear period. The revised bid form requires that a monthly lease rate be provided based on a nine-year lease duration. 6) QUESTION: Will you provide a lease document? Currently there is a sale document in the package. ANSWER: No, the modular unit fabricator shall submit a draft lease contract with their bid for review by the owner. 7) QUESTION: Is steel gage acceptable for exterior siding? (Suggested) ANSWER: Steel Gage is not acceptable.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Connecticut. 1,533 open bids in Connecticut — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42126948

Open Other Bids in Connecticut

CTStateOpenTODAY
Downtown Fairfield Parking Study
State of Connecticut (CTsource) · #38368
Other
CTStateOpenTODAY
Downe Lane And Westport Road Intersection Sight Distance Improvement
BidNet Direct - Connecticut
Other
CTStateOpenTODAY
Downtown Fairfield Parking Study
BidNet Direct - Connecticut
Other