Project is a pavement rehabilitation of Hoefer Court and Maywood Drive. Work includes an inlay, the spot repair of curb and gutter, and adjustment of existing utility structures to facilitate drainage. According to 2022 Pavement Condition Index, PCI for Hoefer Court = 31.5(Poor) and PCI for Maywood Drive = 32.8 (Poor). Project Cost Estimate: $367,000.00
Unlock the source link for this bid, plus email alerts when similar Construction bids open in South Dakota. 272 open bids in South Dakota — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today