This project includes the rehabilitation of approximately 1850 feet of roadway including Creek Drive from the Rapid Creek bridge. This project includes the installation of roadside ditches, culverts, and roadway surface improvements. Project Cost Estimate: $697,000.00
Unlock the source link for this bid, plus email alerts when similar Construction bids open in South Dakota. 272 open bids in South Dakota — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today