Request for Qualifications: Connecting Highland: Access, Neighborhood Growth, Engagement (Project CHANGE) Addendum 1

NCGastoniacityOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

ADDENDUM No. 1 TO: Prospective Submitters FROM: Randi Gates, Director of Transportation DATE: June 15, 2026 PROJECT: Project CHANGE Feasibility and Connectivity Study Q#1 A#1 Regarding the digital PDF copy to be included with the SOQ package, is there a specific file-naming convention to use? No specific file-naming convention is required. However, proposers are encouraged to use the format “FirmName_ProjectCHANGE_SOQ.pdf” for ease of identification and recordkeeping. Q#2 A#2 Can a cover for the SOQ be included, and if so, would it count toward the page limit? Yes. A cover page may be included and will not count toward the 20-page limit. Q#3 A#3 Are “wet-ink” signatures required on the forms, or are e-signatures/DocuSign acceptable? Electronic signatures, including DocuSign or similar authenticated electronic signatures, are acceptable for all required forms and certifications. Q#4 Regarding the minimum font size of 12 points, can a smaller font size be used for tables, charts, or captions? Yes. The minimum 12-point font requirement applies to the main narrative text. Font sizes smaller than 12-point may be used in tables, charts, graphics, organizational charts, and figure captions provided the information remains legible and readable. A#4 Q#5 A#5 Page 8, Section 8 – Statements of Qualifications should include: E. DBE/MWBE Participation Plan. Does a separate DBE/MWBE Participation Plan text need to be included as a discussion point in the SOQ, or does the required DBE/MWBE Participation Plan fulfill this requirement? The required DBE/MWBE Participation Plan fulfills the requirements of Section 8(E). Proposers are not required to provide a separate narrative discussion elsewhere in the 1 SOQ unless they choose to do so. The completed Participation Plan should contain all information requested in Section 8(E) and Exhibit C. Q#6 A#6 Q#7 A#7 Q#8 A#8 Q#9 A#9 Page 8, Section 8 lists submission requirements labeled A, B, C, D, E, G, and H. Was a Section F unintentionally omitted? If so, what information is required for Section F? Yes. Section F was inadvertently omitted during formatting of the RFQ. No additional submission requirement was intended. Sections A, B, C, D, E, G, and H constitute the complete submission requirements. Proposers should disregard the missing Section F reference. Page 9, Section 8 – Please confirm if the H. Project Schedule & Availability section counts toward the page limit. Yes.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in North Carolina. 1,056 open bids in North Carolina — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jun 16, 2026 | ID: 26575325

Open Other Bids in North Carolina

NCStateOpenTODAY
CN1107N-2 Commercial Shelving Units
BidNet Direct - North Carolina
Other
NCCityOpenTODAY
CATS General Maintenance and Repair Services
Charlotte · #269-2026-1783
Other
NCSchoolOpenTODAY
CN1107N-2 Commercial Shelving Units
Onslow County School District · #CN1107N-2
Other
NCStateOpenTODAY
Admin I Security Upgrades
BidNet Direct - North Carolina
Other