Request for Qualifications Central Connecticut Loop Trail (CCLT) Design

CTMiddletowncityOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

The Lower Connecticut River Valley Council of Governments (RiverCOG), in collaboration with the City of Middletown (City) is seeking to engage the services of a Consulting Engineering firm to provide topographic survey, engineering, and public outreach support services for the preparation of preliminary design plans and associated documents for State Project No. 0082-0326, Phase 1 of the Central Connecticut Loop Trail. At the discretion of RiverCOG and the City, the selected firm may also be requested to perform final design, environmental permitting, and other related services, including construction engineering and inspection. A detailed Request for Qualifications can be found at the RiverCOG website: https://www.rivercog.org/publicnotices/ The Central Connecticut Loop Trail Study (CCLT Study), completed in 2025, is a feasibility study to link the Farmington Canal Heritage Trail with the Air Line Trail. The study is available at: https://wwwrivercog.org/plans/cctloopstudy/ As described in the CCLT Study, Phase 1, located in Middletown, encompasses the area from Mile Lane south to LaRosa Lane, Newfield Street, along the Eversource corridor, through the Springside Middletown site, crossing the Coginchaug River and floodplain, and running along North Main Street to the Arrigoni Bridge. The projected construction cost for Phase 1 is expected to be in the range of $2,000,000. Funding for the initial efforts described above will utilize 100% State funding. However, RiverCOG and the City continue to seek funding from any available sources, including federal, that will enable implementation of the CCLT Study goals. Firms responding to this request should be of adequate size and sufficiently staffed to perform the assignment described above in a timely manner. The Consulting Engineering firm will be evaluated and selected based on design and technical competence, the capacity and capability to perform the work within the time allotted, past record of performance, and knowledge of Federal, State, and Municipal procedures, appropriately weighted in descending order of importance. It is anticipated that survey, engineering, and public outreach support services will be negotiated on a Lump Sum basis. Any services performed as Direct Costs shall be subject to procurement in accordance with Connecticut Department of Administrative Services (CT DAS) General Letter 71.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Connecticut. 1,524 open bids in Connecticut — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 10, 2026 | ID: 46268004

Open Other Bids in Connecticut

CTStateOpenTODAY
Connecticut Career Accelerator Program: Fund Manager
BidNet Direct - Connecticut
Other
CTStateOpenSep 8, 2026
Public Address System at Bunker Hill & Tinker Elementary Schools
BidNet Direct - Connecticut
Other
CTStateOpenSep 8, 2026
Pure Storage Support 26-2
BidNet Direct - Connecticut
Other
CTStateOpenSep 8, 2026
Crane Lease/ Rental Services
BidNet Direct - Connecticut
Other