The Sacramento Area Flood Control Agency (SAFCA) is requesting the submittal of proposals for professional services to perform the Morrison Creek & Beach Lake Levee Resiliency Project Final Design based on existing partial design documents. The final design also includes environmental tasks described in more detail in the scope below. SAFCA expects the selected consultant to use the partial design documents in preparing the final design but makes no representation of the suitability or completeness of any part of those documents.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today