Request for Bids: Prosser Apple Orchard Tree Removal Project

WAPORT OF BENTONother specialConstructionCloses in 16 days
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
Nov 9, 2026
Status
Open

Description

Project Name: Prosser Apple Orchard Tree Removal Project Project Address: 2140 Wine Country Rd., Prosser (Walter Clore) Project Estimated Cost: $25,000 Bid Due Date: 11/09/2026 (11:00 AM) Bids Submitted to: Port of Benton procurement 3250 Port of Benton Blvd. (N entrance) Richland, WA 99354 Bids Submitted by email: procurement@portofbenton.com All communication between the Contractor and the Port must be directed to procurement@portofbenton.com The proposal is to be sent electronically or dropped off at 3250 Port of Benton Blvd., Richland WA. Issue Request for Proposals Pre-Bid Meeting at address above Proposals Due Commission Approval Contract Award Project Completion 10/16/2026 10/27/2026 at 11:00 AM 11/9/2026 at 11:00 AM NA 11/10/2026 4/1/2027 The contractor shall provide the Port with at least one week’s notice of the intended start of work. The Contractor will provide a progress schedule prior to beginning work. Contractors shall complete all work no longer than 30 working days from the start of onsite construction. Mandatory Pre-Bid Meeting at 2140 Wine Country Rd., Prosser (Near Walter Clore Center) at 10:30 AM All measurements are approximate, so contractor needs to verify measurements at the Pre-Bid meeting if needed. Contractor shall provide the Port contact information for on-site supervisor prior to work. Supervisor shall be available to oversee all on-site work and shall be responsive to the Port during all workdays on-site. Establish and maintain the perimeter of the project area. Protect all existing stormwater drains (inlet Protection). (Internal Use Only; PR00) All Traffic Control Plans, Rigging Plans, Overhead Protection Plans, Confined Space plans, and Pedestrian Protection plans will be provided to the Port of Benton before any work begins on the project site. Sales tax (8.7%) applies to all aspects of this project. SCOPE OF WORK: • Eligible working days for this project are Monday through Sunday. • Remove and dispose of all(Approx 7 acres) Apple trees by chipping and spreading out. • Remove all stumps and dispose of them from property. • Contractor shall complete all utility locates ground checks • Remove all irrigation lines and dispose • Area where trees were removed must be leveled out and compacted. • All wire must be removed. (Internal Use Only; PR00) BID FORM SMALL WORKS CONTRACT Port of Benton 3250 Port of Benton Blvd.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,487 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Oct 17, 2026 | ID: 107308340

Open Construction Bids in Washington

WACityOpenOct 26, 2026
Precast Concrete Products - Value Blanket
Spokane · #RFQ 6629-26
Construction
WACountyOpenOct 27, 2026
Eastrail - Central Wilburton Interim Trail
King County · #KC001733
Construction
WACountyOpenOct 29, 2026
Shoreline Transfer Station Dust Control Project
King County · #KC001711
Construction
WAutilityOpenOct 29, 2026
1437-Sr - Solicitation For Roster Of Architectural And Engineering Firms
SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT 1 · #RFQ #24-1437-SR
Construction