Pasadena Water & Power (PWP) is replacing the Remote Intelligent Gateway (RIG), existing CAISO meters at the Glenarm Dispatching Station, and the existing CAISO meters at the TM Goodrich Receiving Station in the City of Pasadena. The scope of work in this document is limited to replacement of the existing ten (10) meters at the Glenarm Dispatch Center, addition of two (2) meters for supporting the Glenarm BESS project at the Glenarm Dispatch Center, and the replacement of the three (3) existing meters at the TM Goodrich Receiving Station. PWP will furnish all new revenue meters for this scope of work. The Contractor shall be responsible for the installation, inspection, testing, commissioning, and certification for a total of fifteen (15) meters. The fifteen (15) new meters shall be installed in existing meter sockets and existing meter cabinets. The Contractor shall load PWP provided meter programs into the meters, perform all testing, calibration, installation, and meter certification work. PWP will provide the coordination and communications with CAISO for meter outages as required for the meter replacement work. For the two new BESS meters, PWP shall coordinate with CAISO for the New Resource. The Contractor shall perform loading of PWP provided meter programs, calibration, install, test, meter certification work, and provide completed Meter and Site Verification (MSVS) forms to PWP.
Unlock the source link for this bid, plus email alerts when similar Public Safety bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today