The project generally includes, but is not limited to, the following: 1. Removal of existing loudspeakers, amplifiers, associated audio equipment and wiring, and installation of a complete new audio system as shown in the Contract Documents. 2. Proper offsite disposal of all removed materials in accordance with applicable regulations.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Connecticut. 1,364 open bids in Connecticut — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today