This project consists of relocating the Firestone sewer lateral to connect to the sewer main on SW Cedar Hills Blvd via a new manhole, using a combination of trenchless and open-trench construction methods. Following the lateral relocation, the existing sewer main along SW Canyon Rd will be abandoned, and the two existing cleanouts and sewer manhole located on SW Canyon Rd will be removed.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Oregon. 1,099 open bids in Oregon — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today