Project Scope of WorkThe project will include the following tasks: refurbishment of existing OLTC; radiator & flange repair; comprehensive re-gasketing; and, oil processing & commissioning. Final testing and commissioning upon completion of the work will include TTR (Transformer Turns Ratio, Power Factor (Doble) testing, and Sweep Frequency Response Analysis (SFRA) to ensure proper operation of the refurbished OLTC and its mechanical configuration.
Unlock the source link for this bid, plus email alerts when similar Utilities bids open in California. 5,006 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today