Readiness Road Rehabilitation Project: The Readiness Road Rehabilitation Project at Southern California Logistics Airport consists of the reconstruction and rehabilitation of approximately 97,000 square feet of existing roadway pavement along Readiness Road and adjacent areas. The project includes milling and removal of the existing asphalt pavement section, excavation of unsuitable materials, compaction of native subgrade, installation of crushed miscellaneous base, and placement of new hot mix asphalt pavement. The work will improve roadway conditions, extend pavement life, and enhance access for airport tenants and operations. Additional improvements include the installation of approximately 360 linear feet of conduit for future infrastructure needs, removal and replacement of existing curb and gutter, adjustment of utility structures to final grade, and construction of ADA-compliant parking improvements. New pavement striping and markings will also be installed to improve traffic circulation and accessibility.
Unlock the source link for this bid, plus email alerts when similar bids open in California. 4,993 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today