The Work under this project includes installing Maintenance Of Traffic (MOT), removing and replacing railing, terminal wall, and guardrail, and applying concrete penetrant sealer. Existing bridge railing system shall be retained and provided to the City. Contractor shall deliver existing railing system to location determined by the City.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Virginia. 775 open bids in Virginia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today